Halcott Electrical

CallGet a quote

Services

Six circuits: what each job covers, the certificate you get, and whether Building Control is told.

1

Fuse board upgrades

An old fuse box replaced with a modern consumer unit with RCD protection. Every circuit is tested and labelled, and the schedule inside the door is filled in so you know which breaker does what.

The power is off while the board is changed; the quote says for how long. Sometimes the energy supplier has to fit an isolator first, and we arrange that with you.

Ask for a quote for this
Certificate you get
Electrical Installation Certificate
Building Control told?
Yes. Replacing a consumer unit is notifiable work.
A finished consumer unit on a pale wall, breakers in a row and the cables dressed neatly above them
2

Lighting

Downlights, pendants, under-cabinet strips and garden lights, with dimmers where you want them. We agree where each light goes before any ceiling is opened.

Ask for a quote for this
Certificate you get
Minor Works certificate on an existing circuit, or an Electrical Installation Certificate for a new one
Building Control told?
Only for a new circuit, or for changes near a bath or shower.
Gloved hands connecting brown and blue cables into a new ceiling rose
3

Sockets and switches

Extra sockets, USB-C outlets, smart and dimmer switches, moved or added on your existing circuits. Plates to match what you have, or a new finish for the whole room.

Ask for a quote for this
Certificate you get
Minor Works certificate
Building Control told?
No, unless it needs a new circuit or the room has a bath or shower.
A brushed steel double socket with USB-C and a matching dimmer above an oak skirting board
4

Landlord safety reports

The whole installation inspected and tested, and a written report on its condition. Anything that needs fixing is coded on the report and priced separately, so you choose who does it.

What the rules ask of landlords

Ask for a quote for this
Certificate you get
Electrical Installation Condition Report (EICR)
Building Control told?
No. It is an inspection, not building work.
An electrician's gloved hands testing a consumer unit with a screwdriver
5

EV chargers

A home charger on its own new circuit, placed where the cable reaches your parking space. We check your supply and board can take it before we quote.

Ask for a quote for this
Certificate you get
Electrical Installation Certificate
Building Control told?
Yes. A new circuit is notifiable work.
6

Rewires

Part or whole-house rewires, planned room by room so you know which parts of the home are without power and when. Floors and walls opened only where the cables have to run.

Ask for a quote for this
Certificate you get
Electrical Installation Certificate
Building Control told?
Yes. New circuits are notifiable work.

Also on the schedule: kitchen and bathroom circuits, fault finding and shop lighting. Ask about another job

The paperwork

Three kinds of certificate, and the rule for when Building Control has to be told.

The three certificates
CertificateWhat it coversWays
Electrical Installation CertificateNew circuits, a new consumer unit, a rewire.1, 2, 5, 6
Minor Works certificateAdding to or changing an existing circuit, such as an extra socket or light.2, 3
Electrical Installation Condition ReportThe condition of the whole installation. A report, not new work.4

When Building Control is told

Under the Building Regulations in England, Building Control has to be told when the work is:

  1. a new circuit,
  2. a replacement consumer unit, or
  3. an addition or change to circuits in a special location: the space around a bath or shower.

Source: The Building Regulations 2010, regulation 12(6A)

For landlords

The rules for letting a home in England, in order.

What landlords must do, and when
WhenWhat
At least every 5 yearsThe installation inspected and tested by a qualified person, who gives you a report (usually an EICR).
Within 28 days of the inspectionA copy of the report to your existing tenants.
Before they move inA copy to new tenants.
Within 28 days of askingA copy to anyone who may become a tenant.
Within 7 days of askingA copy to the local council.
Within 28 days, or sooner if the report saysAny remedial work or further investigation the report asks for, then written confirmation to your tenants and the council within 28 days.

The codes on the report

C1
Danger present. Work required.
C2
Potentially dangerous. Work required.
FI
Further investigation needed without delay.
C3
Improvement recommended. Not required.

Source: GOV.UK, Electrical safety standards in the private and social rented sectors: guidance

Tell us the job

We reply within one working day with a time to look, then a written quote before any work starts.